top of page

9 ELIZABETH ST

2024 | ELIZABETH ST, BELMONT

The client had done some initial work of reconfiguring the layout of the house and was in the midst of doing an extension to the back of the property. Thus, needed some assistance in documenting the work done in order to get authorization from the local council ensuring compliance with the local council regulations and accurately represented site conditions and design intent.

© 2025 by DANICA GAN

bottom of page